Project Overview

ATM was contracted by Vac-Con to provided design, permitting, and construction services for wastewater improvements associated with the proposed facility modifications. The wastewater design consisted of calculating estimated wastewater demand for the proposed facility modifications while incorporating the existing wastewater demands. The existing gravity sanitary sewer lines were re-rerouted and new gravity sewer lines for the proposed facility modifications were installed. Wastewater flow was conveyed to a new privately owned lift station located within the facility.

Services included design development, construction cost estimates, permitting, final design, bid assistance, shop drawing review, and construction services administration.

 