Project Overview

ATM was retained to provide a technical review of the reports, data and studies conducted to date for the proposed container facility at Port Moin.

ATM was also retained to provide a gap analysis for the overall project relative to the impacts to the coastal system and support in development of responses to comments from SETENA on the potential environmental impacts of the proposed project.

Specific work included review of technical documents and development of a gap analysis from environmental and engineering points of view and determining existing risk, if any, arising from gaps; analysis of alternatives for the project design relative to mitigation of coastal impacts; providing technical analysis that permitted APM to present SETENA with the information needed review the project in terms of coastal erosion and mitigation.

MENU