Project Overview

Since 2007, ATM has provided a wide range of services to assist the Christophe Harbour Development with their marina and coastal engineering challenges. Services to date have include Bathymetric Surveying, Flood Mapping and Surge Analyses, Tidal Study, Wave Studies, Wind Studies, Water Quality Study and Monitoring, EIA Support, Marina Engineering Feasibility, Marina Market Assessment, Wave Modeling, Flushing Model for the marina basin, Earthworks Design and Bidding, Dredging Design and Bidding, Structural Design (fixed concrete pier and steel sheet pile bulkhead), Jetty and Revetment Design, Marina Design and Bidding, and administration of multiple construction contracts over the course of the project.  ATM remains involved in several ongoing efforts throughout the property.

MENU